Quick answer
For a wall that mostly shows 1080p or lower, set the target canvas and closest viewing distance first, then choose an EA600COB3 pitch that matches that canvas and source detail. Budget cabinets, control, processing and scaling, media server or playback, calibration, spares, structure, freight and commissioning as separate lines, and request the exact cabinet matrix before comparing totals.
Sources used: EA600COB3 specs; Church LED Display Guide &; Conference LED Screen Guide: 2026
Set the 1080p Canvas and Viewing Distance Before Choosing Pitch
Define active screen width, height, aspect ratio and final pixel resolution before content production begins. Use the closest and farthest viewing positions to judge whether text and interface elements are readable. A finer pitch increases pixel density, but it should be justified by viewing distance and source resolution. For a wall dominated by 1080p material, set the target canvas to the 1080p source resolution and ask which pitch achieves it at the planned wall size. Use a pixel pitch and viewing distance method before discussing a COB premium.
The EA600COB3 uses 600 × 337.5 mm 16:9 cabinets, and the source describes them as matching 2K, 4K and 8K sources without cropping or scaling. That format is relevant when most content is 1080p or another 16:9 source, but it does not remove the need to confirm the exact cabinet array and processor settings for your resolution. Ask for the cabinet matrix that produces your target 1080p canvas at each candidate pitch.
Separate Display, Processing, Media Server and Calibration Budget Lines
A complete proposal should separate LED cabinets, video controller, mounting structure, power and signal distribution, spare modules, freight, installation and commissioning. A project budget should also include structure, control equipment, cabling, electrical work, installation, calibration, training, spare parts and service. Our advice is to keep processing and scaling, media server or playback, and calibration as their own lines rather than blending them into the cabinet price. Use a content and media server budget method to keep those operating lines visible.
Image quality depends on pixel pitch, native canvas resolution, processor scaling, calibration, and viewing distance. Readability also depends on source resolution, scaling and ambient light. When most content is 1080p, the processor or scaler may need to map that source to the wall native canvas, so the quotation should state who supplies and configures it. The EA600COB3 source names the control system among price factors, so ask whether playback hardware sits inside that control line or is quoted separately.
EA600COB3 Documented 4K UHD Cabinet Arrays by Pitch
| Pitch | Documented 4K UHD array | Cabinet count |
|---|---|---|
| P1.25 | 8 × 8 | 64 |
| P0.93 | 6 × 6 | 36 |
| P1.56 | 10 × 10 | 100 |
| P1.87 | 12 × 12 | 144 |
How Pitch and Cabinet Count Change the EA600COB3 Display Line
Cabinet count for a given resolution changes with pitch. The EA600COB3 source documents these 4K UHD arrays: at P1.25 an 8 × 8 array of 64 cabinets; at P0.93 36 cabinets in a 6 × 6 array; at P1.56 100 cabinets in a 10 × 10 array; and at P1.87 144 cabinets in a 12 × 12 array. For a 1080p target the array will differ, so the quotation should state the exact cabinet matrix for the target resolution and pitch. Use a cabinet format quote comparison before accepting a blended rate.
At P1.25 each cabinet is 480 × 270 pixels, and all six pitches share one 150 × 168.75 mm module. Those facts matter to the budget because the display line follows the chosen pitch and cabinet count, while the spare-module line follows the module footprint. The source states that COB modules are generally more expensive than equivalent SMD modules. EA600COB3 price is quoted per project because it depends on pixel pitch, total wall area, cabinet quantity, control system, spare modules, mounting structure and shipping, and two walls of the same size can differ several times over between P0.62 and P1.87.
Power, Structure and Spares as Ownership Lines
Maximum consumption is 140 W/m² at P0.62 and P0.78, 280 W/m² at P0.93, P1.25 and P1.56, and 220 W/m² at P1.87. Average consumption is 50 W/m², 95 W/m² and 75 W/m² respectively. The source advises using the average figure for running-cost estimates but sizing the supply, UPS and cabling on the maximum figure. Separate power distribution, UPS and electrical scope from the cabinet line.
Each EA600COB3 cabinet is 30 mm deep and weighs 4.1 kg, about 20 kg per m² of finished wall. The source states that less depth and weight mean lighter mounting steelwork and easier retrofits into shallow recesses. Those are cabinet and wall-condition facts, not a structural limit. Put mounting structure, installation, ventilation and commissioning on separate lines. Spare modules should also be their own line, matched to the exact pitch and shared module footprint.
When the Fine-Pitch COB Premium Is Justified and When to Defer
Start with the target canvas and closest viewing distance. Then shortlist EA600COB3 pitches by the cabinet matrix they require for that canvas. A finer pitch increases pixel density but should be justified by viewing distance and source resolution. Choose the finer pitch when the closest viewing position and the source detail require it; choose a coarser pitch when 1080p content and the viewing distance do not justify the extra density. Defer the decision when the cabinet matrix, control scope, calibration scope or price inclusions are not in writing. Use compare LED screen quotes to keep offers on the same lines.
The EA600COB3 source states price is quoted per project because it depends on pixel pitch, total wall area, cabinet quantity, control system, spare modules, mounting structure and shipping. Our advice is to request an itemised quotation that names the exact pitch, cabinet quantity, native canvas, control system, processing and scaling scope, media server or playback scope, calibration, spare modules, mounting structure, freight, installation and commissioning. Treat any line left blank as unresolved.
Budget Lines to Itemise Separately From the EA600COB3 Display Cabinet Line
| Budget line | What to request |
|---|---|
| Display cabinets and pixel pitch | Exact EA600COB3 pitch, total wall area and cabinet quantity for the target canvas. |
| Control system | State whether the video controller is inside the display quote or separate, and what it includes. |
| Processing and scaling | Identify the processor or scaler, who configures it, and how the source maps to the native canvas. |
| Media server or playback | State whether playback hardware is inside the control line or quoted separately. |
| Calibration | Request calibration as its own line with handover scope and acceptance method. |
| Spare modules | Ask for the spare-module SKU matched to the exact pitch and module footprint. |
| Mounting structure | Keep structure, installation and ventilation on separate lines from the cabinets. |
| Freight and commissioning | Separate shipping, freight, installation and commissioning. |
P1.25 4K cabinet count
Illustrative calculation: 8 × 8 = 64 cabinets. EA600COB3 source example: P1.25 4K UHD wall is an 8 by 8 cabinet array.
P0.93 4K cabinet count
Illustrative calculation: 6 × 6 = 36 cabinets. EA600COB3 source example: P0.93 4K UHD wall is a 6 by 6 cabinet array.
P1.56 4K cabinet count
Illustrative calculation: 10 × 10 = 100 cabinets. EA600COB3 source example: P1.56 4K UHD wall is a 10 by 10 cabinet array.
P1.87 4K cabinet count
Illustrative calculation: 12 × 12 = 144 cabinets. EA600COB3 source example: P1.87 4K UHD wall is a 12 by 12 cabinet array.
Buyer checklist
- Define active screen width, height, aspect ratio and final pixel resolution before content production begins.
- Request the exact EA600COB3 cabinet matrix for your target canvas at each candidate pitch.
- Ask for separate quote lines for display cabinets, control system, processing and scaling, media server or playback, calibration, spare modules, mounting structure, freight, installation and commissioning.
- Confirm whether the 16:9 cabinets match your 1080p source without cropping or scaling, and who configures the processor.
- Size the supply, UPS and cabling on the maximum consumption figure for the quoted pitch.
- Put spare modules on their own line matched to the exact pitch and module footprint.
Frequently asked questions
For a 1080p content wall, does a finer EA600COB3 pitch always mean a higher total project cost?
The source does not state a single price rule. It states that EA600COB3 price is quoted per project because it depends on pixel pitch, total wall area, cabinet quantity, control system, spare modules, mounting structure and shipping, and that two walls of the same size can differ several times over between P0.62 and P1.87. Request an itemised quotation for the exact configuration.
How many EA600COB3 cabinets does a 4K UHD wall need at different pitches?
The source documents these 4K UHD arrays: P1.25 uses 64 cabinets in an 8 × 8 array; P0.93 uses 36 in a 6 × 6 array; P1.56 uses 100 in a 10 × 10 array; P1.87 uses 144 in a 12 × 12 array. For a 1080p target, ask the supplier to confirm the equivalent matrix.
Should processing and a media server be separate budget lines from the LED cabinets?
A complete proposal should separate LED cabinets, video controller, mounting structure, power and signal distribution, spare modules, freight, installation and commissioning, and a project budget should include calibration and training. Our advice is to request processing and scaling, media server or playback, and calibration as named lines so a blended cabinet total cannot hide them.
Does the EA600COB3 16:9 cabinet remove scaling for 1080p content?
The source describes the 16:9 cabinets as matching 2K, 4K and 8K sources without cropping or scaling. The supplied source gives 4K UHD array examples rather than a 1080p matrix, so ask the supplier to state the native canvas and scaling path for your target 1080p configuration.
What power figures should a 1080p EA600COB3 wall budget use?
Maximum consumption is 140 W/m² at P0.62 and P0.78, 280 W/m² at P0.93, P1.25 and P1.56, and 220 W/m² at P1.87. Average consumption is 50 W/m², 95 W/m² and 75 W/m² respectively. Use the average figure for running-cost estimates and the maximum figure for sizing supply, UPS and cabling.
What is the biggest budgeting mistake when most content is 1080p or lower?
Budgeting by a blended square-metre rate or defaulting to the finest pitch before confirming the native canvas and viewing distance. A finer pitch increases pixel density but should be justified by viewing distance and source resolution. Define the active resolution, request the exact cabinet matrix, and keep display, control, processing, media server, calibration, spares, structure and freight on separate lines.
Share your project requirements to request a quote.
CHECK THE DETAILS
Sources & references
Source pages can change. Access dates record when they were consulted.
- EA600COB3 specs Accessed 28 September 2026
- Church LED Display Guide & Accessed 28 September 2026
- Conference LED Screen Guide: 2026 Accessed 28 September 2026
Put these details into your project brief.
Tell EagerLED the application, destination and screen dimensions you have in mind.
Request a project quote