An EagerLED resource. Public-source references and technical guidance; not a binding quotation. Read our methodology.

Quick answer

Treat the quoted AC input range as a display condition, not a complete electrical package. For EA600COB3, cabinets run AC 100–240 V, 50–60 Hz, and the source says to size supply, UPS and cabling on maximum power rather than average. For EA1000F2, published configurations list AC 90–264 V, but final electrical design should follow the selected model and local requirements. Budget supply, breakers, UPS or generator, cabling and commissioning as separate written lines.

Sources used: EA600COB3 specs; EA1000F2 specs; Church LED Display Guide &; Conference LED Screen Guide: 2026

Treat the input range as a briefing input, not the electrical scope

The published AC input range tells the electrical designer what display condition the selected model documents. EA600COB3 cabinets run on AC 100–240 V, 50–60 Hz, and the source gives maximum consumption per square metre by pitch and average consumption for running-cost estimates. EA1000F2 published configurations list AC 90–264 V input. Final electrical design should follow the selected model and local requirements.

Comparing AC 100–240 V and AC 90–264 V is not about choosing a better range. It is about whether the site supply and the contractor’s proposed connection are within the documented display condition for the exact model. Ask the electrical contractor to state in writing how the actual site supply compares with the quoted input range. For outdoor work, use a power conditioning budget method to keep conditioning, earthing and protection visible as separate lines.

Itemize the supply, protection, backup and commissioning lines

The display quotation and the electrical installation are different scopes. For EA600COB3, the source says to size supply, UPS and cabling on the maximum figure rather than the average. That establishes maximum power as the sizing input for those electrical items on that model. Treat breakers, generators, wiring, installation and commissioning as separate lines to confirm.

A complete proposal should separate the LED cabinets, video controller, mounting structure, power and signal distribution, spare modules, freight, installation and commissioning. Ask each supplier to state typical and maximum power for the selected model, then have the electrical design checked for the complete system. Use an average vs maximum power comparison method so the sizing basis is visible.

Site voltage questions are separate from the display input range. Ask the electrical contractor to define the point of connection, overcurrent protection, isolation, cabling route, voltage-drop check and commissioning tests for the actual site. For EA1000F2, final electrical design should follow the selected model and local requirements. Do not accept a single power included line without that underlying scope.

Electrical scope lines to request

Decision Evidence to request
Display input condition For EA600COB3, confirm AC 100–240 V, 50–60 Hz for the quoted cabinets. For EA1000F2, confirm AC 90–264 V and that final electrical design follows the selected model and local requirements.
Maximum demand For EA600COB3, ask for maximum W/m² for the selected pitch. The source lists 140 W/m² at P0.62 and P0.78, 280 W/m² at P0.93, P1.25 and P1.56, and 220 W/m² at P1.87.
Average demand For EA600COB3, ask for average W/m² for the selected pitch. The source lists 50 W/m², 95 W/m² and 75 W/m² respectively and says average is for running-cost estimates.
Supply and UPS sizing For EA600COB3, the source says to size supply, UPS and cabling on maximum rather than average.
Breakers and protection Ask the electrical contractor to state scope and exclusions for overcurrent protection, isolation, earthing and surge protection.
UPS or generator Ask the electrical contractor to define whether UPS or generator backup is required and how it interfaces. For EA600COB3, size UPS on maximum.
Cabling Ask who supplies and installs cabling, and request the route and voltage-drop check. For EA600COB3, size cabling on maximum.
Commissioning Ask for written test and commissioning records as a separate quotation line.

Use EA600COB3 maximum power for supply, UPS and cabling

EA600COB3 cabinets run on AC 100–240 V, 50–60 Hz. Maximum consumption is 140 W/m² at P0.62 and P0.78, 280 W/m² at P0.93, P1.25 and P1.56, and 220 W/m² at P1.87. Average consumption is 50 W/m², 95 W/m² and 75 W/m² respectively. The source says average is the figure to use for running-cost estimates and that supply, UPS and cabling should be sized on maximum rather than average.

Keep average and maximum separate on the quotation. Request both figures for the exact pitch and wall area, and use a fine-pitch COB power and cooling budget method to keep power, cooling and electrical lines visible.

EA1000F2: local requirements govern the final electrical design

EA1000F2 published configurations list AC 90–264 V input and a -20 to +60°C working-temperature range. The same source says final electrical design should follow the selected model and local requirements. That means the AC input figure is a display condition to pass to the electrical designer, not a substitute for the site design.

For outdoor advertising, the electrical scope may also need coordination with structure, access and weather protection. The source documents IP65 protection for outdoor installation, but that cabinet protection is not an electrical installation design. Keep hardware vs installed cost separate so the cabinet total does not hide site work.

A practical budgeting sequence

Fix the exact model, pitch, cabinet quantity and screen area first. For EA600COB3, record AC input, maximum power per square metre and average power per square metre for the selected pitch. For EA1000F2, record AC 90–264 V input and the -20 to +60°C working range. Then brief the electrical contractor with those documented inputs.

Ask for separate lines for supply connection, breakers or overcurrent protection, UPS or generator interface, cabling, earthing, testing and commissioning. The EA600COB3 source directly says to size supply, UPS and cabling on maximum rather than average. Other building work may still be contractor scope. Compare totals only when the display and electrical lines use the same assumptions.

Mistakes that confuse AC input range with electrical scope

One mistake is assuming a wider or narrower AC input range removes the need for electrical design. The EA1000F2 source states that final electrical design should follow the selected model and local requirements. Another is using average power for EA600COB3 to size supply or UPS when the source says to use maximum. A third is treating IP65 outdoor cabinet protection as electrical protection.

Another mistake is comparing a cabinet quotation that excludes breakers, cabling and commissioning with one that includes them. Request the same line items and exclusions. Ask suppliers to quote the same screen size, performance criteria, installation scope, spares, warranty, training and acceptance tests. Use a compare LED screen quotes checklist so each offer answers the same rows.

Model and site scenarios

Scenario What to confirm
EA600COB3 indoor COB wall Confirm AC 100–240 V 50–60 Hz, maximum W/m² and average W/m² for the selected pitch, and use maximum for supply, UPS and cabling.
EA1000F2 outdoor advertising Confirm AC 90–264 V input, -20 to +60°C working range, IP65 outdoor protection, and that final design follows selected model and local requirements.
Site voltage compatibility question Ask the electrical contractor to compare the actual site supply with the quoted input range and state any conditioning or interface requirement in writing. For EA1000F2, final design follows selected model and local requirements.
UPS or generator backup Define whether backup is inside the LED quotation or the electrical contractor scope. For EA600COB3, size UPS on maximum power.
Commissioning and records Request electrical test and commissioning records as separate lines before comparing totals.

Buyer checklist

  • Name the exact model and pitch: EA600COB3 AC 100–240 V, 50–60 Hz; EA1000F2 AC 90–264 V and -20 to +60°C.
  • For EA600COB3, request both maximum and average W/m² for the selected pitch; use average for running-cost estimates and maximum for supply, UPS and cabling.
  • Ask the electrical contractor to define supply connection, overcurrent protection, earthing, surge protection, cabling, UPS or generator interface and commissioning as separate lines.
  • Confirm that the final electrical design follows the selected model and local requirements for EA1000F2.
  • Request written inclusions and exclusions on the same screen size, performance criteria, installation scope, spares, warranty, training and acceptance tests.
  • Keep hardware vs installed cost separate so the cabinet total does not hide electrical site work.

Frequently asked questions

Does the EA600COB3 cabinet quotation include supply, breakers and UPS?

The source documents AC 100–240 V, 50–60 Hz and power figures, and says to size supply, UPS and cabling on maximum rather than average. It does not state that breakers, generators, wiring, installation or commissioning are included in the cabinet quotation. Treat those as separate written lines and confirm exclusions.

What is the quote difference between AC 100–240 V and AC 90–264 V?

They are published input ranges for two named models: EA600COB3 runs on AC 100–240 V, 50–60 Hz, while EA1000F2 published configurations list AC 90–264 V. For budgeting, use the exact model range as an electrical briefing input. For EA1000F2, final electrical design should follow the selected model and local requirements, so the range does not by itself set breaker, cabling or UPS scope.

Should UPS or generator sizing use average or maximum power?

For EA600COB3, the source says average consumption is the figure to use for running-cost estimates, while supply, UPS and cabling should be sized on the maximum figure rather than the average. Do not use the average figure as the backup sizing basis for that model.

How should site voltage affect the electrical scope?

Ask the electrical contractor to compare the actual site supply with the quoted input range and state any conditioning or interface requirement in writing. For EA1000F2, final electrical design should follow the selected model and local requirements. The display input range is not a substitute for the site design.

What electrical lines should be itemized separately?

Our advice is to itemize the supply connection, overcurrent protection, earthing, surge protection, cabling, UPS or generator interface, testing, commissioning and records. A complete proposal should separate power and signal distribution, installation and commissioning so quotations can be compared on the same scope.

Can IP65 replace the electrical protection scope?

No. For EA1000F2, IP65 describes cabinet protection for outdoor installation. It is not a substitute for the electrical design for supply, earthing, surge protection or commissioning. Keep the cabinet rating on the product line and the electrical design on the contractor line.

Share your project requirements to request a quote.

Check the details

Sources & references

Source pages can change. Access dates record when they were consulted.

  1. EA600COB3 specs Accessed 28 September 2026
  2. EA1000F2 specs Accessed 30 September 2026
  3. Church LED Display Guide & Accessed 28 September 2026
  4. Conference LED Screen Guide: 2026 Accessed 28 September 2026

Put these details into your project brief.

Tell EagerLED the application, destination and screen dimensions you have in mind.

Request a project quote