Quick answer
Budget unloading as a separate logistics line. Ask the supplier for shipped crate weight, crate dimensions and crate count, and ask a lifting contractor which method the site permits. Price the lifting equipment, operator, traffic control, labor, permits and standby as separate lines. Cabinet weights such as EA500C6 6.5 kg indoors or 7.3 kg outdoors and EA640F2 7.5 kg are cabinet figures, not crate weights.
Sources used: EA500C6 specs; EA640F2 specs; EA250WH5 specs; EA600COB3 specs
Start With Crate Data, Not Cabinet Weight
Cabinet weight is not crate weight, so start the unloading budget with the shipment rather than the model page. Ask the supplier to state the weight and dimensions of each crate or case as shipped, the crate count, and how the cabinets are packed for the route. A product page may list cabinet weight: the EA500C6 uses 500×500 mm cabinets listed at 6.5 kg indoors or 7.3 kg outdoors, and the EA640F2 is a 640×480 mm indoor cabinet listed at 7.5 kg. Those figures describe the cabinets, not the load a crane, hoist or forklift has to handle. Keep the unloading line visible beside the landed logistics total.
Cabinet count matters as well, because a larger wall means more cabinets and more crates. The EA250WH5 weight varies by cabinet format: 250 mm-high formats weigh 3.0 to 5.7 kg, while 500 mm-high formats weigh 5.3 to 10.5 kg. A single figure per model is therefore not enough to plan a delivery. Ask for crate-level data for each different format in the order, and plan around the heaviest and largest crate rather than the average.
Match the Unloading Method to the Site
Crane, hoist or forklift suitability is a site question, so put it to a lifting contractor rather than deciding from cabinet weight. Give the contractor the crate list and ask which method the site permits, what access that equipment needs at this address, whether ground or overhead conditions change the plan, and what traffic control or permit the delivery window requires. Our advice is to record the distance from the truck position to the set-down point, plus door widths, steps and overhead obstructions, in whatever pre-purchase site survey you commission, then pass those inputs to the lifting contractor.
For rental inventory, handling features are part of the same decision. The EA500C6 has aluminum handles, stainless steel screws and quick locks for frequent handling, and four corner protectors that help shield LED edges from knocks during transport, stacking, installation and dismantling. Those features describe handling the cabinet once it is out of its case; they do not state how the shipment arrives, so ask the supplier to confirm crate or flight-case details. The EA500C6 quotation request asks the quote to identify the controller, spare parts, rigging, flight cases and freight, which is a useful place to see what the delivery line covers.
Unloading decisions and the evidence to request
| Decision | Evidence to request |
|---|---|
| Crate weight and dimensions | Request crate weight, crate dimensions, pallet or case details and crate count for the exact shipment. EA500C6 cabinet weight is listed at 6.5 kg indoors or 7.3 kg outdoors, which is a cabinet figure. |
| Distance and access | Ask the lifting contractor what inputs they need for the route from the truck to the set-down point, and price that route as a line. |
| Lifting method | Ask the contractor which of crane, hoist or forklift the site permits, and what each option needs at this address. |
| Traffic control and permits | Ask the site manager or local authority what traffic control, road closure or permit the delivery window needs, and price it separately. |
| Labor and standby | Price the crew that moves crates, the equipment operator and any standby time if the truck waits. |
| Quote inclusion | Ask whether unloading, rigging, flight cases and freight are included or excluded. The EA500C6 quotation request asks the quote to identify the controller, spare parts, rigging, flight cases and freight. |
| Model handling | Confirm exact cabinet figures before ordering: EA640F2 7.5 kg per cabinet; EA250WH5 3.0 to 5.7 kg or 5.3 to 10.5 kg by cabinet height; EA600COB3 4.1 kg. |
Separate the Unloading Budget Lines
Budget unloading as several lines rather than one bundled fee: lifting equipment, equipment operator, traffic control, labor to move crates from the truck to the set-down point, permits or road-closure charges, and standby time if the truck waits. Ask each supplier or local contractor to price those lines for the exact crate list, delivery address and time window. Keep the unloading lines beside, not inside, the hardware quotation so you can see which party owns each step.
For an outdoor rental wall, the ground support system is a separate engineered scope from delivery unloading, so do not merge the two lines. The delivery plan should state who removes the crates from the truck, who moves them to the build area, who returns the lifting equipment after the window, and what happens if the truck arrives outside the booked slot. If the truck cannot park at the set-down point, ask the contractor what labor or equipment bridges that distance and price it as its own line. This is budgeting method; it does not assume any particular site condition.
Model-Specific Handling Details to Confirm
Model pages give useful cabinet inputs but not a complete unloading plan. The EA250WH5 is a 30 mm deep indoor LED display wall that supports wall-mounted, suspended or column installation. Its 250 mm-high formats weigh 3.0 to 5.7 kg and its 500 mm-high formats weigh 5.3 to 10.5 kg. Because one family covers several formats and three mounting methods, the delivery plan should name the exact cabinet sizes, quantities and crate arrangement rather than the model name alone.
The EA640F2 is a 640×480 mm indoor cabinet, 60 mm deep and 7.5 kg per cabinet, with magnetic modules, power supplies and receiving cards removable from the front. Front service describes the installed wall’s maintenance route, so ask the supplier separately for shipped crate weight and dimensions. The EA600COB3 is a 600×337.5 mm cabinet, 30 mm deep and 4.1 kg, about 20 kg per m² of finished wall. Treat all of those as cabinet figures, then request crate weight, crate dimensions and pallet or case details for the actual shipment.
Build a Delivery Plan Before You Approve a Budget
Write the delivery plan down before you price anything. It should name the delivery address, truck type, arrival window, crate count, crate weight, crate dimensions, distance from truck to set-down, the access route, the lifting method and the party responsible for each step. Price the equipment, operator, traffic control, labor, permits and standby against that plan, and keep them out of the installed cost line for the display. If any input changes, the unloading quote should be reissued rather than adjusted verbally. Do not approve a budget while the delivery plan is still an assumption.
Supplier quote inputs help make the plan specific. The EA500C6 quote request asks for screen dimensions, venue type, viewing distance and delivery city. The EA640F2 quote request asks for screen size, viewing distance and installation city. The EA250WH5 quote request asks for screen dimensions, viewing distance and delivery city. The EA600COB3 quote request asks for wall dimensions, viewing distance, content type and delivery city. Those inputs let the logistics contractor and the display supplier work from one configuration, and they make it easier to compare LED screen quotes across bidders using the same crate list and access assumptions.
Common Budgeting Mistakes
The first mistake is using cabinet weight as crate weight; the product pages list cabinet figures, and the shipped weight is a separate number to request in writing. The second is assuming unloading is included in the display quotation. The EA500C6 quotation request names rigging, flight cases and freight as items the quote should identify. EA250WH5 pricing depends on pixel pitch, wall size, cabinet quantity, control system, spare modules and shipping. EA600COB3 pricing depends on pixel pitch, total wall area, cabinet quantity, control system, spare modules, mounting structure and shipping. EA640F2 pricing is quoted per project because pixel pitch, cabinet quantity, control equipment, spare parts and delivery all affect the total. Those references show freight and delivery are quotation inputs; they do not establish that a particular unloading method, permit or standby charge is included.
The third mistake is leaving traffic control, permits and standby time out of the budget, because those are site services rather than cabinet features. The fourth is comparing only the cabinet price when one offer excludes unloading and another includes it. Keep the unloading lines visible, and ask every bidder to price the same crate list, delivery address, access assumptions and time window. If crate weight and dimensions cannot be confirmed before shipment, that gap belongs on the risk list rather than inside the budget.
Delivery scenarios and what to confirm
| Scenario | What to confirm |
|---|---|
| Indoor fixed wall with EA640F2 | The cabinet is 640×480 mm, 60 mm deep and 7.5 kg, with front-service modules. Ask the supplier for shipped crate dimensions and compare them with the route into the building. |
| Rental event with EA500C6 | The cabinet is 500×500 mm at 6.5 kg indoors or 7.3 kg outdoors. The quotation request names rigging, flight cases and freight, so ask which of those the quote covers. |
| Fine-pitch COB wall with EA600COB3 | The cabinet is 600×337.5 mm, 30 mm deep and 4.1 kg, about 20 kg per m² of finished wall. Quote factors include mounting structure and shipping. |
| Shallow indoor wall with EA250WH5 | 250 mm-high formats weigh 3.0 to 5.7 kg and 500 mm-high formats weigh 5.3 to 10.5 kg. Name the exact format, quantity and crate arrangement before pricing equipment. |
| Truck cannot reach the set-down point | Ask the contractor what labor or equipment bridges the distance and price it as a separate line rather than assuming a method. |
EA600COB3 cabinet footprint
Illustrative calculation: 0.6 × 0.3375 = 0.2025 m². Illustrative area of the EA600COB3 600 × 337.5 mm cabinet stated in the product source.
EA600COB3 cabinet weight per screen area
Illustrative calculation: 4.1 ÷ 0.2025 = 20.2469 kg/m². Illustrative check using the catalogued 4.1 kg cabinet weight and the 600 × 337.5 mm cabinet footprint; the quotient rounds to about 20 kg per m², matching the source figure, and describes cabinet-only screen area rather than crate or shipment weight.
Buyer checklist
- Request crate weight, crate dimensions, pallet or case details and crate count before pricing any lifting equipment.
- Record the distance from the truck position to the set-down point, plus door widths, steps and overhead obstructions, as inputs for the lifting contractor.
- Ask a lifting contractor which of crane, hoist or forklift the site permits, and what each option needs at this address.
- Price lifting equipment, operator, traffic control, labor, permits and standby as separate lines.
- Ask the supplier whether unloading, rigging, flight cases and freight are included or excluded in the quotation.
- Use the same crate list, delivery address, access assumptions and time window for every bidder.
Frequently asked questions
Can I use EA500C6 cabinet weight to choose a forklift?
No. EA500C6 cabinets are listed at 6.5 kg indoors or 7.3 kg outdoors, which is cabinet weight rather than the weight a lifting contractor handles. Ask the supplier whether packing, pallets or flight cases are included and request their dimensions and weights in writing, then ask the contractor which method the site permits.
What should the delivery plan include for an EA640F2 indoor wall?
Name the exact EA640F2 cabinet count and crate arrangement. The cabinet is 640×480 mm, 60 mm deep and 7.5 kg, with front-service modules. Record the route from truck to set-down and any lifting restriction, and price unloading separately from the display.
Does EA250WH5 cabinet weight change with cabinet height?
Yes. In the supplied specifications, 250 mm-high EA250WH5 formats weigh 3.0 to 5.7 kg, while 500 mm-high formats weigh 5.3 to 10.5 kg. Use the exact cabinet format for the crate list and delivery plan.
Are freight and unloading the same line in an EA600COB3 quote?
Not necessarily; ask for an itemized quote with separate unloading lines. EA600COB3 pricing depends on pixel pitch, total wall area, cabinet quantity, control system, spare modules, mounting structure and shipping, which does not establish that unloading equipment, traffic control or permits are included. The cabinet is 600×337.5 mm, 30 mm deep and 4.1 kg.
What if the truck cannot park at the set-down point?
Price the additional labor or equipment needed to bridge the distance, and ask the contractor what that requires. Add it to the delivery plan and to the unloading quote as its own line rather than assuming a method.
Share your project requirements to request a quote.
Check the details
Sources & references
Source pages can change. Access dates record when they were consulted.
- EA500C6 specs Accessed 30 September 2026
- EA640F2 specs Accessed 28 September 2026
- EA250WH5 specs Accessed 30 September 2026
- EA600COB3 specs Accessed 28 September 2026