Quick answer
Budget receiving as its own set of lines: offloading, uncrating, packing-list reconciliation, cabinet-level damage photography, spare counting, waste removal and a quarantine area. Ask the supplier for shipped crate weight, dimensions and count for the exact order; documented cabinet weights, such as the EA500C6 at 6.5 kg indoors or 7.3 kg outdoors, are not crate weights. Labour rates and inspection fees are project-specific and not published in the supplied sources.
Sources used: EA500C6 specs; EA576H1 specs; EA640F2 specs; EA1000H8 specs
Separate Receiving, Uncrating and Inspection From the Cabinet Price
Treat receiving as a project scope with named lines rather than absorbing it into the cabinet rate. Our budgeting advice is to list offloading, uncrating, packing-list reconciliation, cabinet-level damage photography, spare counting, waste removal and a quarantine area separately, then ask each party to price those lines for the exact delivery. Keep the receiving lines visible when you compare LED screen quotes, because a low cabinet total can hide handling work.
The product pages show that freight, spares and accessories sit in the commercial scope rather than the cabinet specification. The EA500C6 quotation request asks for an itemized quote identifying the controller, spare parts, rigging, flight cases and freight. That does not establish that uncrating, inspection or waste removal are included, so add any receiving line you need if the quote does not show it.
Start With Shipped Crate Data, Not Cabinet Weight
Cabinet weight is not crate weight. The EA500C6 die-cast aluminum cabinet is listed at 6.5 kg indoors or 7.3 kg outdoors, the EA576H1 576 × 576 mm cabinet at 8 kg, and the EA640F2 640 × 480 mm cabinet at 7.5 kg. Use those figures only to understand the cabinets, then ask the supplier for shipped crate weight, crate dimensions, crate count, and net and gross weight per crate for the exact shipment. Align that request with your export crating and packing budget.
Crate data drives the labour estimate more directly than cabinet count because the crew opens, stages and removes packing at crate level. If the order mixes cabinet formats, request a separate crate line for each format so the receiving plan matches the packing list rather than an average. Our advice is to defer budget approval until crate weight, dimensions and count are confirmed in writing.
Receiving Lines and Evidence to Request
| Decision | Evidence to request |
|---|---|
| Shipped crate data | Request crate weight, dimensions, count, and net and gross weight per crate for the exact order. Cabinet weights such as EA500C6 6.5 kg indoors or 7.3 kg outdoors are not crate weights. |
| Offloading | Price equipment, operator, traffic control, labour and standby as separate lines; ask the contractor which method the site permits. Keep freight and rigging visible because the EA500C6 quote request asks those to be identified. |
| Uncrating and staging | Define who opens crates, where empty crates are staged, and how cabinets move from crate to inspection area. |
| Packing-list reconciliation | Tie each crate to cabinet model, pixel pitch, cabinet quantity, spare content and crate number. |
| Damage photography | Request cabinet-level photographs, crate numbers and packing-list references; keep damaged items in quarantine. |
| Spare counting | Confirm exact spare modules and electronics for the named model; the EA576H1 page asks for compatible spare power supplies and receiving cards with the order. |
| Waste removal | Ask who removes crates, pallets, barriers, desiccant and blocking, and when. |
| Quarantine area | Define location, access and who controls released or rejected items. |
Scope the Uncrating and Inspection Sequence
Write the receiving sequence as steps: offload; move crates to a staging area; open crates; reconcile the packing list against cabinet model, pixel pitch, cabinet quantity and spare content; photograph any damage at cabinet level; count spares; remove waste; and place questionable items in a quarantine area. The packing list should tie each crate to the exact order, so the inspection can be checked without opening every cabinet.
Inspection tasks should be scoped to the exact cabinet. The EA500C6 has four corner protectors that help shield LED edges from knocks during transport, stacking, installation and dismantling, and aluminum handles, stainless steel screws and quick locks support frequent handling. The EA576H1 has handles, fixing slots, quick locks and corner protectors that help protect module edges during handling. Put those checks on the receiving record for the named model.
Model-Specific Features That Change the Inspection Work
The EA640F2 fixed indoor cabinet uses magnetic modules, power supplies and receiving cards that are all removed from the front, and each cabinet carries six 320 × 160 mm modules in a 2 × 3 layout. For receiving, that means the spares to count and the module-level damage to photograph are the front-service items named for that model, not a generic cabinet inventory. Confirm the exact spare content in writing.
The EA1000H8 rental LED board supports both front and rear service and uses a detachable power box with a quick-release buckle. Its cabinet design includes carrying handles, fixing slots, quick locks and corner protectors for repeated event setup. The EA500C6 and EA1000H8 product pages list optional curved hardware, so if a curved layout is intended, confirm whether the curve locks are part of the shipment and inspect that hardware separately.
Damage Claims, Quarantine and Waste Removal
Set up a quarantine area before the crates are opened, and keep damaged or questionable cabinets separate from accepted stock. Photograph crate damage, packing damage and cabinet-level damage before cabinets are moved into the venue, and tie each photo to the crate number and packing-list line. This is our recommended receiving method; the supplied product sources do not publish claim procedures or inspection fees.
Waste removal should be a separate line because crates, pallets, moisture barriers, desiccant and internal blocking all generate waste on site. Ask who removes the packaging, where it is staged and whether the removal happens during the delivery window or after inspection. Keep that line visible beside the crane, hoist or forklift unloading budget rather than merging the two scopes.
A Step-by-Step Receiving Budget Sequence
First, name the exact EagerLED model, cabinet format, pixel pitch, cabinet quantity and delivery destination. Second, request shipped crate weight, dimensions, count and net and gross weight per crate. Third, ask the supplier or contractor to price offloading, uncrating, packing-list reconciliation, damage photography, spare counting, waste removal and quarantine as separate lines. Fourth, keep those lines beside the display quotation rather than inside it.
Defer approval when crate data, spare content or model configuration is unclear. Documented cabinet weights change by model: EA500C6 6.5 kg indoors or 7.3 kg outdoors, EA576H1 8 kg, EA640F2 7.5 kg. Those are cabinet figures. If the receiving quote is based on cabinet weight instead of shipped crate data, treat it as provisional rather than approved. For upper-floor routes, keep the manual handling and stair carries budget separate from receiving.
Model Receiving Scenarios and What to Confirm
| Scenario | What to confirm |
|---|---|
| EA500C6 rental delivery | Confirm 500 × 500 mm cabinet weight 6.5 kg indoors or 7.3 kg outdoors, four corner protectors, handles, quick locks, and spare-module content. |
| EA576H1 outdoor rental | Confirm 576 × 576 mm cabinet weight 8 kg, front and rear service, removable power box, corner protectors, and compatible spare power supplies and receiving cards. |
| EA640F2 fixed indoor | Confirm 640 × 480 mm cabinet weight 7.5 kg, six 320 × 160 mm modules, front-service magnetic modules and spare content. |
| EA1000H8 rental board | Confirm 500 × 1000 mm cabinet, front and rear service, detachable power box, handles, fixing slots, quick locks and corner protectors. |
| Curved layout | Confirm whether optional curve locks are included for the named model and inspect that hardware separately. |
Buyer checklist
- Request shipped crate weight, dimensions, count, and net and gross weight per crate before pricing receiving labour.
- Price offloading, uncrating, packing-list reconciliation, damage photography, spare counting, waste removal and quarantine as separate lines.
- Confirm model-specific handling features: EA500C6 four corner protectors, handles and quick locks; EA576H1 handles, fixing slots, quick locks and corner protectors.
- For EA576H1, specify compatible spare power supplies and receiving cards with the order.
- Keep receiving lines beside, not inside, the cabinet quotation; the EA500C6 quote request asks for controller, spare parts, rigging, flight cases and freight to be identified.
- Defer approval until crate data, spare content and model configuration are confirmed.
Frequently asked questions
Can I use EagerLED cabinet weight to estimate uncrating labour?
No. Cabinet weights such as EA500C6 6.5 kg indoors or 7.3 kg outdoors, EA576H1 8 kg and EA640F2 7.5 kg describe cabinets, not crates. Ask the supplier for shipped crate weight, dimensions and count, then price labour against the crate list.
Does an EA500C6 quotation include uncrating and inspection?
The supplied EA500C6 page asks for an itemized quote that identifies the controller, spare parts, rigging, flight cases and freight. It does not establish that uncrating, inspection, waste removal or quarantine are included, so request those as separate written lines.
What spare parts should be counted on arrival?
Count the spares named in the order. The EA576H1 page advises specifying compatible spare power supplies and receiving cards with the order. The EA500C6 page says spare cabinets are additional and that GOB is listed only on certain pitches, so confirm exact spare modules and do not assume every pitch has GOB.
What should be photographed during receiving inspection?
Our advice is to photograph crate damage, packing damage and cabinet-level damage before cabinets move into the venue, and to tie each photograph to the crate number and packing-list line. For the named model, check handling features such as the EA500C6 four corner protectors and the EA576H1 corner protectors.
Should waste removal be a separate budget line?
Yes, that is our recommendation. Crates, pallets, moisture barriers, desiccant and internal blocking generate on-site waste, so ask who removes the packaging, when, and where it is staged. Keep that line separate from unloading and display cost.
Share your project requirements to request a quote.
Check the details
Sources & references
Source pages can change. Access dates record when they were consulted.
- EA500C6 specs Accessed 30 September 2026
- EA576H1 specs Accessed 30 September 2026
- EA640F2 specs Accessed 5 October 2026
- EA1000H8 specs Accessed 5 October 2026
Put these details into your project brief.
Tell EagerLED the application, destination and screen dimensions you have in mind.
Request a project quote